Olowalu Debris Containment
Can USACE use the same design/construction for the TDS area that is proposed for the final containment area at West Maui (Olowalu) site?
The engineering controls to be used on the proposed final containment area are not necessary at the TDS as it will not be installed below grade, all run-off will be controlled, and this area is temporary in nature. The TDS design is typical for temporary containment and does not require the double liner system or groundwater/gas monitoring systems.